WILDWOOD & EWING STORM IMPROVEMENTS
Boardman, Ohio
CT Project No. 210806
Boardman Township and ABC identified a failing stream crossing at Wildwood Drive. This project involved emergency repair to the stormwater crossing and minor stormwater infrastructure improvements, including replacing and rerouting catch basins and associated storm piping.
For Ewing Road, ABC completed an assessment of the area and identified stream reaches (a small section of a stream) with critical erosion issues. Each was assigned a structural integrity condition rating to prioritize projects. Work is in process to stabilize the stream banks to prevent further erosion.